Prices
No commission
Buyer pays all transaction costs and notary expenses
Request more information or viewing
Consultant / Office Plovdiv
Distance from the property to major attractions
- Town centre: 5 km
- Airport : 12 km
- Grocery shop: 300 m
- Bus stop: 100 m
- Hospital: 500 m
- School: 600 m
Views from the property
- Forest views
- Park views
- Town views
Construction
- Brick-built
Heating
- Air-conditioners
- Electric convectors
Air-conditioning
- Air-conditioning system
The complex has 91 compact apartments with functional interior layout, garages - 21, shops - 4, pharmacy, hairdressing salon, cafe, distributed in 5 residential buildings, each of 4 floors.
In addition to garages, the complex has 70 parking spaces.
The individual buildings of the complex form an inner courtyard with a park section.
The apartments are different types with a living room, a kitchenette, a bedroom (1 or 2), a bathroom / wc, a closet and a veranda / terrace (depending on the floor).
The properties have favorable views, with mountain and city views and functional layout.
The apartments are finished in the degree of completion according to the Bulgarian State Standard:
•Walls and ceilings - gypsum plaster
•Floor - cement screed;
•Under sanitary premises - cement flooring;
•Walls in sanitary premises - lime-cement plaster
•Terraces / floor / - frost-resistant granite tiles
Stairs and corridors:
• Floor - granite;
• Walls - plaster;
• Ceiling - suspended;
• Railings - wrought iron;
• Entrance doors of apartments - armored;
• Elevator - luxurious, silent.
Technical characteristics:
• Structures - monolithic reinforced concrete. The plates are 18cm thick. Seismic forces are projected to be absorbed by reinforced concrete washers;
• Masonry - all exterior and interior walls are made of ceramic Wienerberger blocks, conforming to Bulgarian State Standard EN 771-1: 2003 with high thermal insulation and good sound insulation;
• Thermal insulation - through the appropriate types and sizes of thermal insulation materials we achieve complete protection of the building;
• Joinery - five chamber PVC joinery with high insulating parameters for low energy costs - class A; double glazing with a total gauge of 28mm - 6mm four seasons + white 4mm; with argon gas placed in the glass pane;
• Electrical installations - lighting, optical connection for digital TV and the Internet, intercom installation, lightning protection, earthing installation, preparation for air conditioners;
• Plumbing installation - filled with polypropylene sound-absorbing pipes to the plug, heat-insulated and anti-condensation protection. The meters will be pulsed by radio-frequency reading;
• Installation of piping, installation and installation of air conditioners;
• Access control - 24/7 surveillance of the common parts of the building, control of access to the complex and to the individual entrances of the sections, possibility for individual solution for security and "smart home";
• Common parts - luxurious railings on stairways and floors, sound and heat-insulated inter-floor doors, well-lit staircases with granite stairs, luxury foyers and corridors.
• Support of common areas in the complex
Construction company:
The developer is one of the leading market leaders in civil engineering, becoming increasingly established as a leading construction company for industrial buildings. The success of the company is due to loyalty, correctness, adequacy of market requirements and changes in the construction industry. Essential to the company's firmness is the attention and professionalism with which the highly qualified staff approached every detail and the uncompromising quality of the inputs.
You will need an application for reading the files in .pdf format. In case you do not have that application, you can download it from here Acrobat Reader.